Sunday, November 23, 2008

99% done... part 2....

The driveway. The garage doors are in Dune.



The 2nd built in robe has shelving.....


Master walk in robe has double short hanging space and long hanging space.






The heated towel rail will be delicious in winter!

The vanity is a Yarra with a monaco grande top. I liked a single sink so there is lots of bench space. The mirrored cupboard built over head has tons of storage so things can stand up instead of rolling around in a drawer. The shower screen is fully frameless.


The windows of the main bathroom with new carpet!



The front door and master bedroom doors

Another one of the kitchen. The splashback is glass.. which we are disappointed in. It does look boring! Boring cost us about $700 or $800! (boo)


More alfresco doors!




The corinthian door handle. Love it.


The hallway the joins the minor bedrooms, laundry and toilet.



Love the greys of the laundry. It would of looked great in the kitchen, but we were "scared" of a colour too dark in case it didn't look good. But it did!















No comments: